Wednesday, February 23, 2011

2/23/11: Sting: Final Draft

Mini-Project 2: Sting Part 3
Final drafts are due Monday (the 28th) at the start of class.

Turn in both your work files and .avi/.mov

Wednesday, February 16, 2011

2/16/11: Sting: First Draft

Mini-Project 2: Sting Part 2
Everyone will show a draft of their work next Tuesday (no class Monday). Focus on the foundational elements and resist the urge to go into detail. Remember the final draft is due the following Monday.

Please hand in either a QT or .avi movie (not AE projects).

Due: Tuesday the 22nd.

Monday, February 14, 2011

2/14/11: Sting: Pre-production

Mini-Project 2: Sting Part 1
You have two weeks to create a 4-8 second logo animation for a client.
You may choose one of the following mock companies as your client, OR come up with one yourself. You may not use an already existing company for this project.

Your goal is to create something simple, clear, and polished.

Company Profile 1: Versatile
A midsized company delivering top-notch audio equipment to the prosumer.
Branding words: Strong, Clean, Efficient, Bright, Bold

Company Profile 2: Mod Soft
Small software company focused on a small niche of open-ended interactive games. Popular with non-traditional gamers.
Branding words: Adaptive, Young, Fluid, Spontaneous, Inventive

Company Profile 3: Facade
A counter culture clothing line popular with teenagers and young adults.
Branding words: Raw, Jaded, Unfinished, Dark, Rough

PRE-PRODUCTION: BRAINSTORMING and PLANNING

This is arguably the most important stage. It is here that ideas are born. Through iteration and experimentation we can brainstorm many directions.

STEP ONE:
Thumbs
Very board strokes. Focus on basic composition and the motion in stages. Here is the opportunity to explore ideas without commitment. Keep it loose. The more ideas and iterations the better.

STEP TWO:
Boards
Refined thumbs. More finessed composition. Start addressing palette, design, and mood/feeling. The more you figure out here, the less time wasted in production.





Today's Assignment: Pre-Production
Create at least 4 sets of thumbs, exploring different approaches. Keep it loose and simple. Choose your favorite thumb to develop further and create a set of boards. Refine composition and design.

Remember that you'll be graded on your pre-production work as well.

To Turn In:
  1. All your work, and separated into appropriate folders. You are turning in stills, not movies. Make sure images have appropriate filenames and are lossless.
    i.e. (thumb1_01.tif,
    thumb1_02.tif, ...)

    If you choose to use paper for the thumbs, be sure to scan them. I can't be collecting hard copies. Boards must be done in Photoshop or another image editing package.

  2. Brainstorm one or two things you need to learn to complete this assignment.

Due: Wednesday, Next Class

Wednesday, February 9, 2011

2/09/11: Animating (Keys and Interpolation)

ICA3 - Assignment:
Finish setting up cartman in AE, and create an animation experimenting with his rig. Should be somewhere around 2 seconds long. Find a background image for narrative inspiration!

To Turn In:
A Quicktime Movie with the following settings:

  • 24fps (Temporal Resolution)
  • H.264 Compression at Highest Setting
Due: Monday at the start of class

Important Links:
Download the assignment

Monday, February 7, 2011

2/07/11: Time-based Compositing

ICA2 - Assignment:
A client wants to use this clip in their documentary, but the date on the sign is no longer correct. The client doesn't want to travel to the location to re-shoot the footage. Instead, they would like you to change it to June 23th, 2008.

To Turn In:
A Quicktime Movie with the following settings:
  • 24fps
  • Spatial Resolution of 720 x 405 pixels
  • H.264 Compression at Highest Setting
Due: Wednesday at the start of class.

Important Links:
Inclass Assignment Workfiles
Highly Recommended Reading!